Post by glk21c on Aug 2, 2019 7:08:24 GMT -4
The sad part is the deck surface was fully replaced back then (2003) and it was a terrible job, feels like you are driving over constant, small speedbumps on most of the drive. The only place it's smooth is where they later dropped in those pre-built sections of roadway that were then ground flat, now those areas are smooth. Now we get to pay for them to fix it
"Fully funded by tolls, the MDTA’s $27 million project will replace the bridge deck surface of the westbound span right lane. Work also includes making deck repairs, sealing the bridge deck and replacing existing lane-use signal gantries and steel rail posts. Wagman Heavy Civil, Inc., of York, Pa., is performing the work. The project is expected to be complete in August 2021"
|
|